The first project DIVE borehole, located in Ornavasso, is now fully drilled, and reached 578.7 m depth below surface. All logging activities are completed for 2022. Both the core and the logging data recovery were very good. For a lookback at the past months activities, this page collects daily news and photos. The borehole is now sealed, as shown on the picture below, and preparation for the second borehole is ongoing.
- Gotthard Base Tunnel gravimetric study published
- Sismo-à-l’école à Martigny